Each slide rail is marked with either an R (right) or
an L (left). Select one of the slide rails and push up
on the front moveable tab 1; then, pull out the
front latch 2 to slide out the front side rail. If a
thumbscrew is installed in the slide rail 3, remove
it.
Note: When you install a 2U server, be sure to
install the slide rails in the bottom U of the 2U area
in the rack.
From the front of the rack, line up the three pins on
the rear of the slide rail with the three holes in the
selected U on the rear of the rack. Push the rails so
that the pins go into the holes 1, and drop the
slide rail down 2 until it latches into place.
Pull the slide rail forward and insert the two pins
1 on the front of the rail into the two lower holes
in the U on the front of the rack. Drop the rail into
place until it clicks. Push the front latch 2 in all
the way.
Repeat steps 1 through 3 to install the other rail
into the rack. Make sure that each front latch is
fully engaged.
Pull the slide rails forward 1 until they click, two
times, into place. Carefully lift the server and tilt it
into position over the slide rails so that the rear nail
heads 2 on the server line up with the rear slots
3 on the slide rails. Slide the server down until
the rear nail heads slip into the two rear slots, and
then slowly lower the front of the server 4 until
the other nail heads slip into the other slots on the
slide rails. Make sure that the front latch 5 slides
over the nail heads.
3
Komentarze do niniejszej Instrukcji